ASX ANNOUNCEMENT
29 July 2026
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
Quarterly Activities Report for June 2026
Dundas Minerals Limited (ASX: DUN) (“Dundas” or “the Company”) is pleased to present its Quarterly Report
for the period ending 30 June 2026.
HIGHLIGHTS
• Rockland Ownership Consolidated – Dundas irrevocably exercised its option to acquire a 100%
interest in granted Mining Lease M24/974 (Rockland Gold Project), electing to satisfy the
consideration via a cash payment of $100,000 and the grant of a 1.5% net smelter royalty on gold
produced from M24/974
• High-Grade Gold Defined at Rockland – follow-up RC drilling (10 holes, 1,688m) confirmed
continuity of gold mineralisation, with 1m re-assays of composite intervals returning 1m @ 20.35 g/t
Au from 140m (within 3m @ 6.94 g/t Au from 138m, 26RKRC005), 1m @ 5.99 g/t Au from 59m
(26RKRC010) and 1m @ 4.41 g/t Au from 73m (26RKRC003)
• Capricorn Mining Lease Granted – Mining Lease M24/1004, which hosts the Capricorn Gold
Resource, was granted on 8 April 2026. Programmes of Work have been approved for drilling at
Capricorn and Rockland and the corridor between them
• Native Title Clearance Received at Capricorn (post quarter end) – an archaeological and
ethnographic heritage clearance survey over the Capricorn Prospect was completed on 4 July 2026
with the Kapurn Kalamaia Karlaku Traditional Owners of the Marlinyu Ghoorlie native title claim, with
the survey area returned entirely clear. With heritage clearance complete and POW drilling approvals
granted, Dundas is cleared to commence drilling at Capricorn and is positioned to drill across all
three of its Kalgoorlie district gold projects. A tender process to appoint a drilling contractor is
underway
• Native Title Clearances Progressing at Romano – the Company is progressing native title and
heritage clearance processes across the Romano Gold Project ahead of planned on-ground
exploration
• Board Strengthened – Mr David Greig appointed as Non-Executive Director, effective 1 May 2026
• Portfolio Streamlined – withdrawal from the option over the GTT Metals Group tenements (Gerry
Well), reflecting the Company’s focus on its core Kalgoorlie district gold assets
• $2.5M Placement Completed – Tranche 2 of the $2.5M Placement was completed on 17 April 2026,
following the shareholder approval at the General Meeting held on 10 April 2026
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
ACTIVITIES
Rockland Gold Project – Drilling Results and 100% Ownership
During the quarter, the Company completed and reported results from its follow-up reverse circulation (‘RC’) drilling
programme at the Rockland Gold Project, located on granted Mining Lease M24/974, approximately 40 km north of
Kalgoorlie, Western Australia. The programme comprised 10 RC holes for 1,688m, designed to test strike and depth
extensions to the high-grade gold mineralisation identified in the Company’s maiden drilling campaign (the final two
planned holes having been aborted in the prior quarter due to Cyclone Narelle).
On 7 April 2026, the Company announced that drilling had concluded and that it had irrevocably exercised its option
under the Option Agreement with Rockland Pty Ltd to acquire a 100% interest in M24/974. Dundas elected to satisfy
the consideration via a cash payment of $100,000 to Rockland (or its nominees) and has agreed to grant Rockland
(or its nominee) a 1.5% net smelter royalty on all gold produced from M24/974, with Dundas retaining a first right of
refusal to re-purchase the royalty on arm’s length commercial terms.
Initial assay results, reported as 4m composite samples on 11 May 2026, intersected broad zones of gold
mineralisation beneath and along strike from previously reported high-grade discovery intercepts, including:
• 4m @ 4.54 g/t Au from 140m (26RKRC005)
• 12m @ 1.22 g/t Au from 172m, including 4m @ 3.13 g/t Au from 180m (26RKRC005)
• 8m @ 0.79 g/t Au from 68m, including 4m @ 1.04 g/t Au from 72m (26RKRC003)
On 23 June 2026, the Company reported single-metre (1m) re-assay results for selected mineralised intervals
previously reported as 4m composites. The 1m re-assays were generated by submitting the retained 1m parent
samples for individual photon assay, providing a higher-resolution view of grade distribution within the previously
composited intervals. Significant results include:
Hole ID From (m) To (m) Interval (m) Au (g/t) Comment
26RKRC005 138 141 3 6.94 incl. 1m @ 20.35 g/t from
140m
26RKRC010 59 61 2 3.25 incl. 1m @ 5.99 g/t from 59m
26RKRC003 69 75 6 1.02 incl. 1m @ 4.41 g/t from 73m
Note: Down hole length, true widths are not known but are interpreted to be close to actual reported widths. Intercepts are reported using a 0.2
g/t Au cut-off grade.
The results confirm high-grade gold within mineralised shoots hosted in a north-south mineralised trend interpreted
to extend for over 2 km from the Capricorn gold deposit through the Aquarius prospect and the 1 km of identified
mineralisation at Rockland. Mineralisation remains open along strike and at depth, with four lodes interpreted over
the Rockland strike length and grades appearing to improve at depth below a depleted zone. The deepest mineralised
intercept returned to date at Rockland is 4m @ 3.13 g/t Au (composite) / 1m @ 2.67 g/t Au from 180m (re-assay) in
hole 26RKRC005.
Capricorn Gold Project – Mining Lease Granted, Drilling Being Prepared
Mining Lease M24/1004, which hosts the Capricorn Gold Resource (659,300t @ 1.2 g/t Au, Inferred), was granted
on 8 April 2026. Dundas is earning an 85% interest in the tenement, which is held by Black Mountain Gold Pty Ltd, a
wholly owned subsidiary of Maritana Minerals Ltd (previously Horizon Minerals).
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
A Programme of Work (‘PoW’) has been approved for drilling at Capricorn, and PoWs have also been approved for
further drilling at Rockland and the region between the two deposits.
Drilling at Capricorn will target areas where internal conceptual pit shell sensitivity work indicates that limited drilling
has constrained potential mining opportunities. That internal work has been used solely as a drill-targeting tool to
identify areas where additional drilling may improve geological confidence; it is preliminary, is not a mining study,
does not establish economic viability, and should not be interpreted as a production target or forecast financial
information.
Subsequent to quarter end, with heritage clearance secured (see Native Title and Heritage below) and Government-
approved POW drilling approvals in place, the Company is cleared to commence ground-disturbing drilling at
Capricorn. The planned programme is exploration-focused and is designed to test extensions and continuity of the
known gold mineralisation, including infill drilling of the Capricorn gold deposit. A tender process to appoint a suitably
qualified drilling contractor is currently underway, with the Company expecting to provide an update on the drilling
schedule following award of the contract.
Drilling contractors are being approached for follow-up drilling at Rockland and extensional and infill drilling at both
the Capricorn and Baden-Powell gold deposits, which remain open-ended – see figure 1. The most southern line of
drilling at Capricorn has previously returned encouraging results (ASX: 6 February 2024), including 3m @ 9.14 g/t
Au from 114m (23WDRC003) and 3m @ 5.3 g/t Au from 28m (23WDRC004), which align along structures interpreted
to dip east at approximately 30°, consistent with the structural controls observed at Rockland, and which have not
yet been incorporated into the resource model.
Figure 1: Kalgoorlie Project Group
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Native Title and Heritage
The Company progressed native title and heritage clearance processes at both the Capricorn drilling area and the
Romano Gold Project during and subsequent to the quarter.
Capricorn – Native Title Clearance Received (post quarter end)
On 21 July 2026, the Company announced that it had received Aboriginal heritage (native title) clearance over the
Capricorn Gold Project, clearing the way for the Company to commence its planned drilling programme. An
archaeological and ethnographic work program clearance heritage survey of the Capricorn Prospect Project Area
was completed on 4 July 2026 with the Kapurn Kalamaia Karlaku Traditional Owners of the Marlinyu Ghoorlie native
title claim. The survey was conducted by independent heritage consultancy Terra Rosa Consulting in accordance
with the Land Use Agreement and Heritage Protocol applying to the tenement.
The survey returned an excellent outcome for the Company. The Capricorn Prospect survey area was assessed as
clear, with no previously identified Aboriginal heritage places and no areas identified by the Traditional Owner
representatives as ‘not clear’ for the purpose of the proposed works. Preliminary advice confirming this outcome has
been received, with a final heritage report to follow.
The Company thanks the Kapurn Kalamaia Karlaku Traditional Owners for their participation in the survey and looks
forward to continuing to work with them as its programmes advance. In carrying out its drilling, Dundas will observe
the heritage management measures recommended through the survey, including engaging cultural monitors during
initial ground-disturbing works, limiting unnecessary clearing and disturbance, capping historic drill holes, and
rehabilitating disturbed areas on completion of works.
Romano Gold Project
The Company is progressing native title clearance processes and cultural heritage engagement across the Romano
Gold Project tenure.
Baden-Powell Gold Resource
Infill and extensional RC drill planning continued at the Baden-Powell Gold Resource (595,000t @ 1.2 g/t Au,
Inferred). Baden-Powell is open to the north, south and at depth, with 83% of all historical drilling confined to depths
of less than 100m. The project was last evaluated when the gold price averaged approximately A$2,650/oz –
materially below current gold prices.
Romano Gold Project (Yamarna)
The Romano Project is located in the northeastern Goldfields of Western Australia on the eastern margin of the
Yamarna and Dorothy Hills Shear Zones, north of the +6M oz Gruyere gold mine, and comprises approximately 800
km² of contiguous exploration tenure. The Company cautions that proximity to the Gruyere gold mine does not imply
geological continuity, nor that mineralisation extends into the Romano Project area. No Mineral Resources or Ore
Reserves have been estimated for the Romano Project.
Following the grant of tenement E38/3983 on 12 February 2026 (a Milestone under the Cazaly earn-in agreement),
and shareholder approval obtained at the General Meeting held on 10 April 2026, the Company issued 3,661,930
Deferred Consideration Shares ($150,000 worth of shares at a deemed issue price equal to the 5-day VWAP prior
to the grant date) to Cazaly Resources Limited on 7 May 2026. The $150,000 cash component of the Milestone
consideration was paid in the prior quarter.
Planning for initial field programmes at the Bloodwood and Brahman prospects continued during the quarter,
alongside the native title and heritage clearance processes described above.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Gerry Well – Option Withdrawal (GTT Metals Group)
On 11 May 2026, the Company advised that, pursuant to clause 3(c) of the Binding Terms Sheet announced on 21
July 2025, it had exercised its right to terminate its option to acquire exploration tenements E38/3965, E38/3966,
E38/3968, E38/3969, E38/3970, E38/3971 and E38/3896 from GTT Metals Group Pty Ltd, with effect from 10 May
2026. The Company’s obligations under the agreement are now at an end, other than the provision of a written
exploration report to the vendor. The decision reflects the Company’s focus on advancing its core Kalgoorlie district
gold assets, including the Rockland-Aquarius-Capricorn corridor, and the Romano Project.
CORPORATE
Board Appointment
Effective 1 May 2026, Mr David Greig was appointed as a Non-Executive Director of Dundas. Mr Greig brings over
30 years of broad experience across the international construction, open cut, underground mining and mineral
processing sectors, and serves as Group Executive – Australia West at Thiess, having previously been Chief
Executive Officer of MACA Limited. Mr Greig will be paid a Non-Executive Director fee of $60,000 per annum (plus
superannuation) and, subject to shareholder approval, Dundas has agreed to issue Mr Greig 4,000,000 unlisted
options exercisable at $0.08 each and 4,000,000 unlisted options exercisable at $0.12 each, each expiring four years
from the date of issue.
$2.5M Placement – Tranche 2 Completed
Following shareholder approval at the General Meeting held on 10 April 2026, the balance of the Placement as
announced on 12 February 2026 – being 35,881,985 fully paid ordinary shares raising $1.36 million (before costs)
(Tranche 2), including 1,053,000 fully paid ordinary shares for participating Directors – was issued on 17 April 2026,
completing the $2.5 million Placement (being a total of 65,789,474 new shares at $0.038 per share).
Cash Position
Cash balance as at 30 June 2026 was $1.877M.
Financial and Related Party Payments
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this Activity Report. Pursuant to ASX Listing Rule
5.3.5, the total amount paid to related parties of the Company and their associates, as per items 6.1 and 6.2 of the
Appendix 5B, was $114K and includes payments to directors for fees, superannuation and consulting costs paid
during the quarter.
Exploration
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure on project and exploration activities during the
quarter was $216K, in addition to $180K spent on acquisition costs (including the $100,000 Rockland option exercise
payment). The project and exploration activities are detailed in the earlier sections of this report.
In line with obligations under ASX Listing Rule 5.3.3, Dundas provides information with respect to its Mining Tenement
holdings as at 30 June 2026 in Appendix 1.
– ENDS –
This announcement has been authorised for release by the Board of Dundas Minerals Limited.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
FOR FURTHER INFORMATION
Jonathan Downes
Managing Director
Dundas Minerals Limited
P: +61 (08) 9481 0389 | M: +61 412 124 758
E: admin@dundasminerals.com
W: www.dundasminerals.com
ABOUT DUNDAS MINERALS LIMITED
Dundas Minerals Limited (ASX: DUN) is an Australian gold exploration company with a portfolio of projects located in Western
Australia. The Company’s strategy is focused on advancing precious metal exploration assets across both established mining
districts and under-explored frontier regions with demonstrated geological prospectivity.
In the Kalgoorlie district, the Company holds interests in three advanced gold projects - Rockland (discovery), Capricorn and
Baden-Powell - all of which are previously unmined, open-ended and located within close proximity of existing gold processing
infrastructure. In addition, Dundas has extensive exploration holdings on the Gerry Well Greenstone Belt in north-eastern Western
Australia.
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to Exploration Results is based on, and fairly represents, information compiled
by Jonathan Downes (B.Sc. Geology), MAIG, Managing Director of Dundas Minerals Limited. Mr Downes has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken, to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Downes consents to the inclusion in this announcement of the matters based on his information
in the form and context in which it appears.
The information in this announcement that relates to the Baden-Powell and Capricorn Gold Mineral Resources is extracted from
and was originally reported in the ASX announcement titled “Gold Resources Increase to 1.24m oz” published on 28 September
2022 by Horizon Minerals Limited (ASX: HRZ). In its report titled “Group Minerals Resources Statement – Amended” published
on 1 August 2024, HRZ confirmed that it is not aware of any new information or data that materially affects the information included
in the original market announcement and that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed. The Mineral Resource estimates for the Capricorn and Baden-Powell projects
were undertaken by Mr Stephen Godfrey, FAusIMM, MAIG, a full-time employee of HRZ, who has sufficient experience of
relevance to the styles of mineralisation and the types of deposits under consideration, and to the activities undertaken, to qualify
as a Competent Person as defined in the JORC Code 2012. Mr Godfrey has consented to Dundas Minerals Limited reporting
details of the Baden-Powell and Capricorn gold Mineral Resource Estimates in the form and context as set out in this report.
PREVIOUSLY REPORTED INFORMATION
In accordance with ASX Listing Rule 5.7.1 and the JORC Code (2012 Edition), the following table sets out each set of exploration
results referred to in this report, the ASX announcement in which those results were originally reported, and the Company’s
confirmation that it is not aware of any new information or data that materially affects the information included in those original
announcements. All material assumptions and technical parameters underpinning the results continue to apply.
The Company confirms that it is not aware of any new information or data that materially affects any of the exploration results or
mineral resource estimates referenced in this report. All material assumptions and technical parameters underpinning those results
continue to apply. Readers are referred to the original ASX announcements identified above for full details, including all applicable
JORC Code (2012 Edition) Table 1 disclosures.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Project / Prospect Intercepts Referenced Original ASX Announcement
Rockland Gold Project
(M24/974)
4m composite results incl. 4m @ 4.54 g/t
Au from 140m; 12m @ 1.22 g/t Au from
172m; 8m @ 0.79 g/t Au from 68m
11 May 2026: “Dundas Extends Gold Mineralisation
at Rockland”. Full JORC Table 1 disclosure is
contained in that announcement.
Rockland Gold Project
(M24/974)
1m re-assay results incl. 1m @ 20.35 g/t
Au from 140m within 3m @ 6.94 g/t Au
from 138m; 1m @ 5.99 g/t Au from 59m;
1m @ 4.41 g/t Au from 73m
23 June 2026: “Rockland Assay Results Define
High-Grade Gold”. Full JORC Table 1 disclosure is
contained in that announcement.
Capricorn Gold Project
(M24/1004)
3m @ 9.14 g/t Au from 114m
(23WDRC003); 3m @ 5.3 g/t Au from 28m
(23WDRC004); 1m @ 6.6 g/t Au from 25m
(23WDRC005)
6 February 2024: “High Grade Gold Intercepts from
Windanya Drilling”
Aquarius Prospect 3m @ 10.2 g/t Au from 109m incl. 1m @
29.6 g/t Au (23WDRC012); 2m @ 6.5 g/t
Au from 70m (23WDRC011)
6 February 2024: “High Grade Gold Intercepts from
Windanya Drilling”; 21 January 2025: “High-Grade
Intercepts Confirm 1km Mineralised Trend”
Baden-Powell Gold
Resource (23,000 oz Au)
JORC 2012 Inferred Mineral Resource:
595,000t @ 1.2 g/t Au
Originally estimated by Horizon Minerals Limited
(ASX: HRZ), reported 28 September 2022: “Gold
Resources Increase to 1.24m oz”. Competent
Person: Mr Stephen Godfrey (FAusIMM, MAIG),
HRZ.
Capricorn Gold
Resource (25,500 oz Au)
JORC 2012 Inferred Mineral Resource:
659,300t @ 1.2 g/t Au
Originally estimated by Horizon Minerals Limited
(ASX: HRZ), reported 28 September 2022: “Gold
Resources Increase to 1.24m oz”. Competent
Person: Mr Stephen Godfrey (FAusIMM, MAIG),
HRZ.
COMPLIANCE STATEMENTS
Previously Reported Exploration Results: Any references in this announcement to prior exploration results are extracted from
previous ASX announcements. The Company confirms it is not aware of any new information or data that materially affects the
information included in those announcements, and that all material assumptions and technical parameters underpinning those
results continue to apply.
Mineral Resource Estimate: The Capricorn Mineral Resource Estimate was originally reported in the HRZ ASX Announcement
titled ‘Gold Resources Increase to 1.24m oz’ published on 28 September 2022. HRZ confirmed in its report titled ‘Group Mineral
Resources Statement — Amended’ (1 August 2024) that it is not aware of any new information or data that materially affects the
information included in the original announcement and that all material assumptions and technical parameters continue to apply.
Forward Looking Statements: This announcement contains forward-looking statements. Forward-looking statements are often,
but not always, identified by the use of words such as “seek”, “target”, “anticipate”, “forecast”, “believe”, “plan”, “estimate”, “expect”
and “intend”, and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be achieved, and other
similar expressions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause
actual results to differ materially from those expressed or implied in such statements.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Appendix 1 – Tenement Information as required by ASX Listing Rule 5.3.3
Schedule of Mineral Tenements Held by Dundas at 30 June 2026
Project Tenement Status Holder Interest
Baden-Powell P24/5666 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5667 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5668 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5796 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5797 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5798 Granted Dundas Minerals Limited 100%
Baden-Powell P24/5823 Granted Dundas Minerals Limited N/A
Gerry Well E38/3153 Granted Dundas Minerals Limited 100%
Gerry Well E38/3741 Granted Dundas Minerals Limited 100%
Gerry Well E38/4001 Application Dundas Minerals Limited N/A
Gerry Well E38/4017 Application Dundas Minerals Limited N/A
Gerry Well E38/4021 Application Dundas Minerals Limited N/A
Rockland M24/974 Granted Rockland Pty Ltd¹ 100%¹
Rockland P24/5754 Granted Dundas Minerals Limited N/A
Windanya P24/5687 Granted Dundas Minerals Limited 85%
Windanya P24/5754 Application Dundas Minerals Limited N/A
Windanya P24/5836 Application Dundas Minerals Limited N/A
Romano E38/3904 Granted Cazaly Resources Limited Earn-in²
Romano E38/3983 Granted Cazaly Resources Limited Earn-in²
Romano E38/3995 Application Cazaly Resources Limited Earn-in²
Romano E38/4000 Application Cazaly Resources Limited Earn-in²
Romano E38/4002 Application Cazaly Resources Limited Earn-in²
Romano E38/3995 Granted Cazaly Resources Limited Earn-in²
Romano E38/3983 Granted Cazaly Resources Limited Earn-in²
Romano E38/4065 Application Dundas Minerals Limited N/A
Notes:
¹ Dundas has irrevocably exercised its option to acquire a 100% interest in M24/974 via cash payment of $100,000, and has agreed to grant the
vendor a 1.5% net smelter royalty on gold produced from the tenement.
² Dundas may earn an 80% interest in Romano Project tenements under the earn-in agreement with Cazaly Resources Limited as announced on
30 December 2025, requiring $2M in exploration expenditure within 2 years. During March 2026 quarter, Dundas paid $150,000 in cash and
$350,000 worth of shares (‘Upfront Consideration’). On the grant of each application tenement, Dundas agreed to pay Cazaly Resources Limited
an additional $150,000 in cash and issue an additional $150,000 worth of shares at a deemed issue price equal to the 5 day VWAY prior to the
grant date and subject to shareholder approval sought at 10 April 2026 General Meeting (‘Deferred Consideration’). Following the grant of
E38/3983, Dundas paid the $150,000 cash consideration on 27 February 2026 and on 7 May 2026 issued $150,000 worth of Deferred
Consideration shares at the deemed issue price.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
SCHEDULE OF MINERAL TENEMENTS SUBJECT TO THE HORIZON OPTION
The Company has an option to acquire an 85% Joint Venture interest in each tenement listed below. The tenements
are held by Black Mountain Gold Pty Ltd, a wholly owned subsidiary of Maritana Minerals Ltd (previously Horizon
Minerals). The option expires 9 months after the grant of Mining Lease M24/1004 (granted 8 April 2026). The option
exercise fee is $1,000,000, payable as cash or fully paid ordinary shares of Dundas Minerals, or a combination, at
the election of Dundas.
Project Tenement Status Holder Interest
Windanya M24/959 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Windanya M24/919 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Windanya P24/5046 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell P24/5507 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell P24/5508 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell P24/5059 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell P24/5464 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell P24/4817 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Baden-Powell M24/1020 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (85% JV)
Capricorn M24/1004 Granted Black Mountain Gold Limited (Maritana Minerals Ltd) Option (80% JV)
Mineral Resource Estimates
Baden-Powell and Capricorn Gold Projects reported at a 0.5 g/t Au cut-off.
Project Material Tonnes Au g/t Oz Au (Inferred)
Baden-Powell Oxide 75,000 1.19 2,900
Transition 61,000 1.04 2,000
Fresh 459,500 1.22 18,000
Total 595,000 1.2 23,000
Capricorn Oxide 313,100 1.23 12,400
Transition 138,800 1.24 5,500
Fresh 207,400 1.13 7,500
Total 659,300 1.2 25,500
Tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding. The above Mineral Resource Estimates comprise Inferred
Mineral Resources only, which are unable to have economic considerations applied to them, nor is there certainty that further sampling will enable
them to be converted to Measured or Indicated Mineral Resources.
Capricorn Project - Reported at 0.5 g/t Au cut-off. Inferred Mineral Resources only. Tonnages are dry metric tonnes; minor discrepancies may
occur due to rounding. Resource estimated in 2022 by Mr Stephen Godfrey (FAUSIMM, MAIG) — refer to HRZ ASX announcement dated 28
September 2022. Mr Stephen Godfrey consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears. Dundas confirms it is not aware of any new information or data that materially affects this estimate.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Dundas Minerals Limited
ABN Quarter ended (“current quarter”)
14 640 432 819 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
- 3
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (114) (416)
(e) administration and corporate costs (122) (401)
1.3 Dividends received (see note 3) - -
1.4 Interest received 3 11
1.5 Interest and other costs of finance paid - (1)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other – exploration applications refund
(provide details if material)
- -
1.9 Net cash from / (used in) operating
activities
(233) (804)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (180) (485)
(c) property, plant and equipment - (3)
(d) exploration & evaluation (216) (819)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(396) (1,307)
3. Cash flows from financing activities
1,364 3,628
3.1 P