Rockland Assay Results
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
23 June 2026
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
Rockland Assay Results Define High-Grade Gold
Single-metre re-assay of selected Rockland intervals updates previously reported 4m composite results
HIGHLIGHTS
• 1m re-assay of the mineralised intervals at the Rockland Gold Project (previously reported as
4m composite results on 11 May 2026) located ~40km north of Kalgoorlie, Western Australia
• Drilling successfully intersected broad zones of gold mineralisation beneath and along strike
from previously reported high-grade discovery intercepts
• Significant assay results include:
- 1m @ 20.35 g/t Au from 140m, within 3m @ 6.94 g/t Au from 138m
(26RKRC005)
- 1m @ 5.99 g/t Au from 59m, within 2m @ 3.25 g/t Au from 59m
(26RKRC010)
- 1m @ 4.41 g/t Au from 73m, within 6m @ 1.02 g/t Au from 69m
(26RKRC003)
• Results support Dundas' interpretation of mineralised shoots within an interpreted north-south
mineralised system
• Mineralisation remains open along strike and at depth in a mineralised trend interpreted to
extend from Rockland through Aquarius, Capricorn and the Gemini prospect in the north.
• Follow-up drilling planned to test depth extensions and potential linkage toward the Capricorn
and Aquarius gold prospects
• PoWs approved for drilling on the recently granted Mining Lease at Capricorn, which hosts a
previously reported Mineral Resource Estimate and, remains open to further drilling on trend
with Rockland and for further drilling at Rockland and the region between them
Dundas Minerals Limited (ASX: DUN) (“Dundas” or “the Company”) advises that it has received single-metre (1m) re-
assay results for selected mineralised intervals previously reported as 4m composite samples on 11 May 2026.
The results confirm high-grade gold in shoots hosted in the mineralised trend that is interpreted to extend for over 2km
from the Capricorn gold deposit down through the 1km of identified mineralisation at Rockland. This extensive system
warrants further drilling and represent a significant emerging gold system within the Kalgoorlie district – see Figures 1 and
2.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Figure 1: Mineralised corridor highlighting interpretive trend from Rockland through to Capricorn and limited shallow
drilling with some better results reported
Figure 2: Mineralised corridor highlighting interpretive trend from Rockland through to Capricorn
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
We are pleased to report that Dundas is moving into an exciting and active period, especially given the recent granting of
the Capricorn Mining Lease. Programmes of Work have been approved, with drilling to proceed following completion of
the required heritage survey, expected in early July. Drilling contractors are being approached for follow up drilling at
Rockland and extensional and infill drilling at both the Capricorn and Baden Powell gold deposits. These deposits are
open ended to further mineralisation and will be advanced through further drilling and technical assessment.
Drilling at Capricorn will be targeting areas that internal mining pit shell optimisations indicate limited drilling has
constrained potential mining opportunities – see Figure 3. Internal conceptual pit shell sensitivity work has been used
solely as a drill-targeting tool to identify areas where additional drilling may improve geological confidence. The work is
preliminary, is not a mining study, does not establish economic viability, and should not be interpreted as a production
target or forecast financial information.
Figure 3: Indicative pit shell modelling over the Capricorn resource generated for the purpose of internal studies and drill
target sensitivity and opportunity
A programme of drilling is also planned to drill between Rockland and Capricorn, noting that the most southern line of
drilling at Capricorn has returned encouraging results (ASX: 6 February 2024), including:
– 23WDRC003: 3m @ 9.14 g/t Au from 114m
– 23WDRC004: 3m @ 5.3 g/t Au from 28m
– 23WDRC005: 1m @ 6.6 g/t Au from 25m
These gold values align along structures interpreted to dip east at approximately 30°, consistent with the structural controls
observed at Rockland and have not yet been incorporated into the resource model. Aquarius, located immediately north
of Rockland on the same interpreted structural corridor, similarly returned high-grade results in earlier drilling (ASX: 6
February 2024) and remains effectively undrilled below shallow depths: Results from the Aquarius include:
– 23WDRC012: 3m @ 10.2 g/t Au from 109m, including 1m @ 29.6 g/t Au from 109m; and 1m @ 5.8 g/t Au from
75m
– 23WDRC006: 1m @ 5.04 g/t Au from 49m, and 3m @ 1.8 g/t Au from 74m
– 23WDRC011: 2m @ 6.5 g/t Au from 70m
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
As noted in the Company’s 11 May 2026 announcement, the original results were generated from 4m composite samples,
each formed by combining a small speared sub-sample from four sequential 1m parent sample piles. The 1m re-assay
results announced today were generated by submitting the retained 1m parent samples themselves for individual photon
assay, providing a higher-resolution view of grade distribution within the previously composited intervals.
The table below sets out all 1m re-assay intervals returned above the 0.2 g/t Au cut-off grade applied to the original
release.
Hole ID
From
(m)
To (m)
Interval
(m)
Au (g/t) Comment
26RKRC001 59 65 6 0.59 incl. 1m @ 1.83 g/t from 59m
26RKRC002 94 95 1 0.25
99 101 2 0.59
126 127 1 0.80
26RKRC003 50 51 1 0.32
55 56 1 0.72
69 75 6 1.02 incl. 1m @ 4.41 g/t from 73m
86 90 4 0.84
106 110 4 0.37
115 116 1 0.23
135 137 2 0.61
145 146 1 0.78
26RKRC004 – – – – No significant results
26RKRC005 138 141 3 6.94 incl. 1m @ 20.35 g/t from 140m
144 145 1 0.21
175 182 7 0.84
incl. 1m @ 2.18 g/t from 175m and 1m @
2.67 g/t from 180m
185 186 1 0.25
26RKRC006 65 67 2 0.35
92 94 2 0.21
173 174 1 2.05
195 197 2 0.42
26RKRC007 62 66 4 0.27
26RKRC008 3 5 2 0.40
57 59 2 0.36
66 67 1 0.53
26RKRC009 8 9 1 0.52
140 143 3 0.32
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Hole ID
From
(m)
To (m)
Interval
(m)
Au (g/t) Comment
26RKRC010 59 61 2 3.25 incl. 1m @ 5.99 g/t from 59m
73 83 10 0.37 incl. 1m @ 1.53 g/t from 73m
Note: Down hole length, true widths are not known but interpreted to be close to actual reported widths. Intercepts are reported using a 0.2
g/t Au cut-off grade. 26RKRC004 returned no results above the cut-off grade in either the original 4m composite or the 1m re-assay.
Figure 4: Interpretive cross section of drill line 6639164N
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Figure 5: Interpretive cross section of drill line 6639220N
– ENDS –
This announcement has been authorised for release by the Board of Dundas Minerals Limited.
FOR FURTHER INFORMATION
Jonathan Downes
Managing Director
Dundas Minerals Limited
P: +61 (08) 9481 0389 | M: +61 412 124 758
E: admin@dundasminerals.com
W: www.dundasminerals.com
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
ABOUT DUNDAS MINERALS LIMITED
Dundas Minerals Limited (ASX: DUN) is an Australian gold exploration company with a portfolio of projects located in
Western Australia. The Company’s strategy is focused on advancing precious metal exploration assets across both
established mining districts and under-explored frontier regions with demonstrated geological prospectivity.
In the Kalgoorlie district, the Company holds interests in three advanced gold projects - Rockland (discovery), Capricorn
and Baden-Powell - all of which are previously unmined, open-ended and located within close proximity of existing gold
processing infrastructure. In addition, Dundas has extensive exploration holdings on the Gerry Well Greenstone Belt in
north-eastern Western Australia.
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to Exploration Results is based on, and fairly represents, information
compiled by Jonathan Downes (B.Sc. Geology), MAIG, Managing Director of Dundas Minerals Limited. Mr Downes has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity
being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Downes consents to the inclusion in this announcement
of the matters based on his information in the form and context in which it appears.
PREVIOUSLY REPORTED INFORMATION
The information in this announcement that refers to previously reported exploration results at the Rockland and Aquarius
prospects was originally reported in ASX announcements dated 21 January 2025, 11 March 2026 and 7 April 2026. The
Company confirms it is not aware of any new information or data that materially affects the information included in those
announcements. All material assumptions and technical parameters underpinning the results continue to apply.
COMPLIANCE STATEMENTS
Previously Reported Exploration Results: Any references in this announcement to prior exploration results are extracted from
previous ASX announcements. The Company confirms it is not aware of any new information or data that materially affects the
information included in those announcements, and that all material assumptions and technical parameters underpinning those results
continue to apply.
Mineral Resource Estimate: The Capricorn Mineral Resource Estimate was originally reported in the HRZ ASX Announcement titled
‘Gold Resources Increase to 1.24m oz’ published on 28 September 2022. HRZ confirmed in its report titled ‘Group Mineral Resources
Statement — Amended’ (1 August 2024) that it is not aware of any new information or data that materially affects the information
included in the original announcement and that all material assumptions and technical parameters continue to apply.
Forward Looking Statements: This announcement contains forward-looking statements. Forward-looking statements are often, but
not always, identified by the use of words such as “seek”, “target”, “anticipate”, “forecast”, “believe”, “plan”, “estimate”, “expect” and
“intend”, and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be achieved, and other similar
expressions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual
results to differ materially from those expressed or implied in such statements.
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Appendix 1: Drill Hole Collar and Intercepts Table
Hole ID
Easting
(GDA 94)
Northing
(GDA 94)
RL
(RHD)
Dip Azimuth Hole Depth
(m)
From To Interval Au Intercepts > 0.2g/t
26RKRC001 332416 6639264 427 -60 270 161 59 65 6 6.0m@0.59g/t from59m
incl. 59 60 1 including1.0m@1.83g/t from59m
26RKRC002 332495 6639264 429 -60 270 185 94 95 1 1.0m@0.25g/t from94m
99 101 2 2.0m@0.59g/t from99m
126 127 1 1.0m@0.80g/t from126m
26RKRC003 332457 6639219 420 -60 270 173 50 51 1 1.0m@0.32g/t from50m
55 56 1 1.0m@0.72g/t from55m
69 75 6 6.0m@1.02g/t from69m
incl. 73 74 1 including1m@4.41g/t from73m
86 90 4 4.0m@0.84g/t from86m
106 110 4 4.0m@0.37g/t from106m
115 116 1 1.0m@0.23g/t from115m
135 137 2 2.0m@0.61g/t from135m
145 146 1 1.0m@0.78g/t from145m
26RKRC004 332419 6639166 429 -60 270 149 - - - NSR
26RKRC005 332503 6639165 420 -80 270 203 138 141 3 3.0m@6.94g/t from138m
incl. 140 141 1 including1.0m@20.35g/t from140m
144 145 1 1.0m@0.21g/t from144m
175 182 7 7.0m@0.84g/t from175m
incl. 175 176 1 including1.0m@2.18g/t from175m
incl. 180 181 1 including1.0m@2.67g/t from180m
185 186 1 1.0m@0.25g/t from185m
26RKRC006 332501 6639164 420 -60 270 203 65 67 2 2.0m@0.35g/t from65m
92 94 2 2.0m@0.21g/t from92m
173 174 1 1.0m@2.05g/t from173m
195 197 2 2.0m@0.42g/t from195m
26RKRC007 332423 6639114 423 -60 270 155 62 66 4 4.0m@0.27g/t from62m
26RKRC008 332464 6639019 435 -60 270 155 3 5 2 2.0m@0.40g/t from3m
57 59 2 2.0m@0.36g/t from57m
66 67 1 1.0m@0.53g/t from66m
26RKRC009 332501 6639022 430 -60 270 155 8 9 1 1.0m@0.52g/t from8m
140 143 3 3.0m@0.32g/t from140m
26RKRC010 332459 6639113 421 -60 270 149 59 61 2 2.0m@3.25g/t from59m
incl. 59 60 1 including1m@5.99g/t from59m
73 83 10 10.0m@0.37g/t from73m
incl. 73 74 1 including1.0m@1.53g/t from73m
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish WA 6008 E: admin@dundasminerals.com
ASX: DUN
ASX ANNOUNCEMENT
Figure 6: Plan view of Rockland showing drill collar locations (note: Hole 5 and 6 were drilled vertical and 60 degrees to the
West respectively from essentially the same collar
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g., cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.).
• Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation Material to the Public
Report.
• Bit face RC cuttings were collected for each metre by bucket from the cone
splitter and put on the ground in piles in rows of 20 or 30. Simultaneously
for each metre drilled a representative 3kg sample was collected from the
cone splitter in a calico and placed next to the parent bulk sample, Once
the hole was geologically logged 4m composite samples were taken for
the entire hole. 1m samples were subsequently collected and submitted
to the lab.
• Regular cleaning by compressed air and by hand pf the cyclone was done
to avoid contamination. The 1m calico samples were marked to match the
drilled metre to avoid confusion and double bagged within a numbered
calico if submitted. Non submitted 1m calico were kept with parent sample
until composite analysed.
• Samples were kept dry throughout with the combination of rig air and
booster air creating an outward 1000+ psi pressure front.
Drilling
techniques
• Drill type and details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-samplingbit or other type, whether core is oriented
and if so, by what method, etc.).
• (5 inch diameter) RC drilling was used with a face-sampling hammer bit.
• It was a truck mounted drill rig and (McKays) air compressor and an
additional compressed air booster.
Drill sample
recovery
• Method of recording and assessing sample recoveries and results.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Sample volumes were visually assessed, no anomalous volumes were
observed. Samples were generally dry, but in rare cases damp samples
were noted, at the meter after rod changes when hole was greater than
100m in depth.
• Regular cleaning of the cyclone, to avoid build-up of clayey material.
• Sample recovery was generally good; no sample bias was observed.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
• The total length and percentage of the relevant intersections logged.
• Chips were collected in chip tray and logged qualitatively by the geologist.
• Logging was qualitative in nature.
• The complete holes were logged in full
• Total length of intersections were logged
Sub-sampling
techniques and
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, split type, and whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
• 1m samples were collected from the cyclone cone splitter shoot and
adjusted to catch a 2kg to 3kg sample. A PVC spear was used in the case
of a composite sample where a similar sized speared sample were
Criteria JORC Code explanation Commentary
sample
preparation
sample preparation technique.
• Quality control procedures adopted to maximise representivity of
samples.
• Measures to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-
half sampling.
• Whether sample sizes are appropriate to the grain size of the material
sampled.
combined into one sample for assaying. Sample records recorded if the
parent sample was dry moist or wet, the sample recovery percentage and
the type of sample. All samples were dry down to approximately 100m.
from which the first sample of each rod was damp.
• The whole sample was pulverised in the laboratory and was split and
taken for photon assay.
• The sample preparation is considered appropriate for the type of sampling.
• Certified Reference Materials and field duplicates were inserted in the
sample submission at a rate of 1 in 25. In addition, internal standards and
repeat assays were used by the laboratory.
• The sample sizes were considered appropriate for the grain size of the
material.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy and precision have been established.
• Samples were submitted to the SGS laboratory in Perth for assaying by
photon assay method. This is the standard industry practice and is
considered a total assay technique.
• Not applicable.
• Laboratory QA/QC involves the use of internal lab standards using
certified reference material, blanks, splits and replicates as part of the in-
house procedures. QC results (blanks, duplicates, standards) were in line
with commercial procedures, reproducibility and accuracy.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• The results have been reviewed by the Company’s external consultants.
• No twinning of drillholes has been undertaken.
• Data were collected in Logchief and later transferred to the Company’s
independently managed database.
• No adjustments were made.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drillhole collars were surveyed with handheld GPS with horizontal
accuracy of ±3m. Data are recorded in UTM coordinates, zone 51S
Geocentric Datum of Australia 1994 (GDA-94).
• Elevation was estimated to the nearest metre from Geoscience Australia
DTM, which is more accurate than handheld GPS elevation data.
Downhole surveys were undertaken by gyro with readings taken every 5m
along the drill trace.
• Topographic control is considered adequate at this stage. Should the data
be subsequently used in a Mineral Resource Estimation, the collars can
be surveyed by DGPS.
Criteria JORC Code explanation Commentary
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• Drillholes were spaced between ~25m and ~80m apart (west to east) on
6 drill lines, mostly spaced ~100m apart (north-south)
• No attempt is made at this stage to undertake Mineral Resource or Ore
Reserve estimations.
• 4m composites were used.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
• Holes were angled 60° towards 270° or vertical, roughly perpendicular to
the regional strike and interpreted structures, but there is considerable
uncertainty about the attitude of possible structures.
• At this stage, there is insufficient data to assess the possibility of sampling
bias.
Sample security • The measures taken to ensure sample security. • Samples were collected in calico bags, in turn placed into larger bags that
were zip locked, and delivered to the SGS laboratory in Perth by Company
staff.
Audits or reviews • The results of any audits or reviews of sampling techniques and data. • None.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
• The results reported in this Announcement are from exploration that was
conducted within granted Mining Lease M 24/974. The lease is 100%
owned by Rockland Pty Ltd and Dundas Minerals has since exercised the
option to acquire the lease outright, via payment of $100,000 The lease is
in good standing and there are no known impediments to the security of,
and access to the lease.
Exploration by other
parties
• Acknowledgment and appraisal of exploration by other parties. • Previous drilling and associated exploration activities such as mapping
was completed within the area of the lease by: Aberfoyle (1987), RAB
drilling to maximum depths of ~50m (96 holes on 11 lines spaced between
~200m and ~25m); Paddington Gold Pty Limited (2000), 34 RAB holes to
depths of 50m-90m on 3 lines spaced 400m apart, and 12 RC holes to
depths of 90m–120m and one hole to 156m on 3 lines spaced 25m apart
at the Windanya North gold prospect; and Rockland Pty Ltd, 3 RC holes
Criteria JORC Code explanation Commentary
at the Windanya North prospect on a north-south line spaced 20m apart to
depths of between 140m – 173m.
Geology • Deposit type, geological setting and style of mineralisation. • The exploration target is Archaean lode gold on the western limb of the
Bardoc-Broad Arrow syncline.
Drillhole Information • A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not detract
from the understanding of the report, the Competent Person
should clearly explain why this is the case.
• Tabulated in Appendix 1.
Data aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high-
grade results and longer lengths of low-grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal equivalent
values.
• Not applicable.
Relationship between
mineralisation widths
and intercept lengths
• These relationships are important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
• Down hole length, true width not known.
Criteria JORC Code explanation Commentary
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported. These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Included in the main text.
Balanced reporting • Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Not applicable.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• Not applicable, no other material exploration data.
Further work • The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provide this information is not commercially sensitive.
• Substantial further drilling is planned down dip at Rocklands and also at
Capricorn and the trend between to two areas of defined mineralisation.
Share your feedback
Discover