Gold Acquisition
Released
Released
Announcement PDF
Dundas Minerals Limited Suite 13, 100 Railway Rd T: +61 (08) 9481 0389
ACN: 640 432 819 Daglish, WA 6008 E: admin@dundasminerals.com
ASX : DUN
ASX ANNOUNCEMENT
30 December 2025
Romano - Frontier Terrain Gold Acquisition
Romano Project Acquisition Expands Dundas’ Frontier Gold Exposure Adjacent to
Gruyere
Dundas Minerals Limited (“Dundas” or the “Company”) announces the acquisition of an
80% interest in a district-scale gold exploration package known as the Romano Project,
located in the north eastern Goldfields of Western Australia. The Romano Project
comprises approximately 800km² of under explored frontier terrain on the eastern
margin of the Yamarna Shear Zone and is located adjacent to the operating Gruyere
gold mine (Figure 1).1 The Company cautions that proximity to an operating mine is not
indicative of mineralisation within the Romano Project and no geological or mineral
continuity has been established between the Romano Project and the Gruyere gold
mine.
The acquisition materially expands Dundas’ exploration footprint into a proven but
under explored gold province and provides exposure to multiple priority targets
supported by historical drilling and geochemical datasets.
Key Highlights
• ~800km2 frontier gold landholding in Western Australia
• Located adjacent to the ~6 Moz Gruyere Gold Mine
• Highly under explored terrain relative to established Goldfields districts
• Multiple priority exploration targets identified through historical exploration,
including the Bloodwood and Brahman prospects
• Bloodwood drill results include 12m @ 3.3 g/t gold from 20 metres, within a 5km
gold in soil anomaly
• Brahman drilling returned 2m @ 3.9g/t gold including 1m @ 7.01g/t gold
• Earn-in structure provides Dundas the right to earn 80% ownership through staged
exploration expenditure
All drilling results referenced are historical in nature and were not generated by Dundas
Dundas’ Managing Director, Jonathan Downes commented:
“Many of Australia’s recent major mineral discoveries, including Gruyere, Hemi and
Nova have been made in frontier terrains or on the margins of historically mined districts.
1
The Company cautions that proximity to an operating mine is not indicative of mineralisation within the Romano
Project and no geological or mineral continuity has been established between the Romano Project and the Gruyere
gold mine.
2
“In my opinion, the Romano Project provides Dundas with exposure to this same
geological opportunity in a region that remains significantly under explored.
The proximity to the Gruyere gold mine highlights the prospectivity of the broader
Yamarna region, while historical work has already identified multiple targets that warrant
systematic follow up.
Figure 1: Location map showing the Romano Project tenure, key gold bearing structures and mineral deposits.
This acquisition aligns with Dundas’ strategy of targeting large-scale gold systems in
under tested frontier regions, while complementing our existing Kalgoorlie exploration
and resource portfolio. We have also commenced building a dedicated technical
team to support this growth strategy as we move into 2026.”
Romano Project Overview and Location
The Romano Project is located in the north eastern Goldfields of Western Australia on
the eastern margin of the Yamarna and Dorothy Hills Shear Zones, regions recognised
for hosting large-scale gold systems, including the nearby Gruyere gold mine. The
project comprises approximately 800 km² of contiguous exploration tenure and remains
sparsely explored relative to more established districts with shallow alluvium and sand
dune overburden. Previous exploration conducted by Gold Road Resources identified
multiple gold targets within the project area, forming a foundation for future systematic
exploration.
3
Figure 2: The Romano Project location on both the Yamarna and Dorothy Hills Shear Zones. Also shown are major gold
projects along these trends.
Gruyere North
Exploration Licence E38/3904 is located immediately north of the operating Gruyere
gold mine, which contains an estimated ~6 Moz gold resource and is mined as a large-
scale open pit operation (Figure 3)1. Gold Fields recently acquired the remaining 50%
interest in the Gruyere gold mine for A$3.7B, consolidating full ownership.
4
Regional mineralisation at Gruyere is interpreted to trend in a north north-westerly
direction and is believed to be related to the Dorothy Hills Shear Zone that continues in
the Romano Project licences. Exploration north of the mine has historically been limited
due to access and cultural heritage considerations. Dundas does not represent that
mineralisation extends into the Romano Project. Not withstanding this, the proximity of
the Romano Project to Gruyere highlights the prospectivity of the broader Yamarna
region. Several tenements withing the Romano Project are subject to pending
exploration licence applications and are not yet granted.
Two of the other prospects within the Romano leases have been identified.
Bloodwood Prospect
The Bloodwood Prospect was identified through historical exploration conducted by
Gold Road Resources, including air core drilling that defined a coherent gold anomaly
extending for approximately 5 km. Limited drilling has returned results including 12 m @
3.3 g/t gold from 20m, with a high-grade interval of 4m @ 9.5 g/t gold from 20m. In the
following year, a single diamond drill hole was drilled at the Bloodwood target, which
returned 2.95 m @ 1.95 g/t gold from 113.45m, including 0.7m @ 4.76g/t gold from 115m
(18CWDD0028).
Drilling across the prospect remains limited, particularly given its proximity to the
Yamarna Shear Zone, which hosts the Golden Highway gold resources approximately
20 km to the south.
Brahman Prospect
The Brahman Prospect is located within the Stock Route Intrusive Suite. Drilling identified
a package of sediments intruded by a dioritic plug (hornblende-feldspar-quartz /-
sericite, hematite, biotite, pyrite). The intrusive rocks exhibit broad similarities to intrusive
rocks observed elsewhere in the region; however no direct geological or mineralogical
correlation with the Gruyere gold mine intrusive has been established.
Historical drilling intersected gold mineralisation, including a best intercept of 2m @ 3.9
g/t gold from 92m, including 1.0m @ 7.01 g/t gold. The presence of broad mineralisation
supports the prospectivity of the target and warrants follow up.
No Mineral Resources or Ore Reserves have been estimated for the Romano Project.
5
Figure 3: Top: Location of the Gruyere Mine which lies along the Dorothy Hills Shear Zone (DHSZ), adjacent to Dundas
Tenure. Bottom: The Gruyere Mine open pit lies 1km south of the border to Dundas’s Romano Project Tenure with the
interpreted DHSZ continuing north into Dundas’ E38/3904.
6
Transaction Terms
Dundas has entered into an agreement with Cazaly Resources Limited (ASX:CAZ) under
which Dundas may earn an 80% interest in the Romano Project tenements (refer to
Schedule 1 for particulars). Within 5 business days of execution, Dundas will pay CAZ
$150,000 in cash and issue $350,000 worth of shares, at a deemed issue price per share
equal to the volume weighted average price of Dundas shares for the 5 trading days
(5-day VWAP) immediately prior to the execution date. The upfront consideration shares
will be issued under Dundas’ existing placement capacity pursuant to ASX Listing Rule
7.1. On grant of each application listed in item 2 of Schedule 1, Dundas must pay CAZ
an additional $150,000 and issue CAZ $150,000 in shares at a deemed issue price equal
to the 5-day VWAP prior to the grant date, subject to shareholder approval2. The earn-
in requires $2,000,000 in exploration expenditure within 2 years.
- ENDS -
This announcement was approved for release by the board of Dundas Minerals Limited.
For further information, please contact:
Jonathan Downes j.downes@dundasminerals.com
About Dundas Minerals Limited
Dundas Minerals (ASX: DUN) is an Australian gold exploration company with a portfolio
of projects located in Western Australia. The Company’s strategy is focused on
advancing gold exploration assets across both established mining districts and under
explored frontier regions with demonstrated geological prospectivity.
In the Kalgoorlie region, Dundas holds an option agreement with Horizon Minerals (ASX:
HRZ) to acquire an 85% interest in the Capricorn and Baden Powell gold projects, which
together host inferred gold resources. These projects provide Dundas with near-term
exploration and development optionality within a well understood gold province.
In addition, Dundas has gold exploration projects north of the Garden Well mine and
East of the Jundee mine, on the Gerry Well Greenstone Belt and retains gold exploration
interests in the Esperance area, where West Cobar Metals are targeting critical minerals.
The Company’s exploration approach emphasizes disciplined capital deployment,
technical rigor and the identification of large-scale mineral systems capable of
supporting future development.
2
If Dundas shareholder approval is not received, Dundas will instead pay $150,000 in cash.
7
Dundas is led by an experienced board and management team with a track record in
mineral exploration and project development and is focused on creating long-term
shareholder value through systematic exploration and asset growth.
Competent Persons Statement
The information in this announcement that relates to the Romano Project and historic
drill holes (Appendix I) is based on information compiled by Jonathan Downes (B.Sc.
(Geology), MAIG), an employee and director of Dundas Minerals Limited. Mr Downes
has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr Downes consents to the
inclusion in the report of the matters based on this information in the form and context
in which it appears. The information included in this report also relates to some
information based on historic Exploration Results. Mr Downes has not independently
verified the historical assay data but considers the information suitable for inclusion to
illustrate prospectivity.
Mr Downes holds securities in the Company.
Forward Looking Statements
This announcement contains forward-looking statements. Forward-looking statements
are often, but not always, identified by the use of words such as “seek”, “target”,
“anticipate”, “forecast”, “believe”, “plan”, “estimate”, “expect” and “intend”, and
statements that an event or result “may”, “will”, “should”, “could” or “might” occur or
be achieved, and other similar expressions. The forward-looking statements in this
announcement are based on current expectations, estimates, forecasts and projections
about Dundas and the industry in which it operates. They do, however, relate to future
matters and are subject to various inherent risks and uncertainties. Actual events or
results may differ materially from the events expressed or implied by any forward-looking
statements. The past performance of Dundas is no guarantee of future performance.
None of Dundas’ directors, officers, employees, agents or contractors makes any
representation or warranty (either express or implied) as to the accuracy or likelihood of
fulfilment of any forward-looking statement, nor do they assume any responsibility for
the accuracy or completeness of the forward-looking statements, except to the extent
required by law. You are cautioned not to place undue reliance on any forward-looking
statement. The forward-looking statements in this announcement reflect views held only
as at the date of this announcement.
8
Any references to potential mineralisation or endowment at Romano are conceptual in
nature. There has been insufficient exploration to estimate a Mineral Resource and it is
uncertain if further exploration will result in the estimation of a Mineral Resource.
9
S C H E DU L E 1 – TE N E ME N T SC H E DU L E
Item 1 – Tenements
TENEMENT TYPE STATUS GRANT DATE REGISTERED HOLDER
E38/3904 EXPLORATION
LICENCE
LIVE 14/07/2025 CAZALY RESOURCES
LIMITED
Item 2 – Applications
TENEMENT STATUS SIZE DATE OF APPLICATION
E38/3983 PENDING 57 SB 21 January 2025
E38/3995 PENDING 21 SB 19 March 2025
E38/4000 PENDING 28 SB 8 April 2025
E38/4002 PENDING 90 SB 16 April 2025
10
Table A: Drill hole collar information and significant intercepts
Prospect Hole Id Type Easting Northing
Depth
(m)
RL Azimuth Dip
From
(m)
To (m)
Interval
(m)
Au
(g/t)
Bloodwood 18CWDD0028 DDH 551,946 6,922,320 199.4 433 270 -60 113.45 116.4 2.95 1.95
including 115 115.7 0.7 4.76
18CWAC0920 AC 551,896 6,922,319 40 434 273 -60 20 32 12 3.31
including 20 24 4 9.53
Brahman 18SRRC001 RC 561,803 6,904,210 160 413 -61 72 92 94 2 3.92
including 92 93 1 7.01
and 97 98 1 0.77
All drill hole data is historical in nature and sources from public disclosures by
previous explorers. Dundas has not independently verified the underlying primary
sampling or assay data.
Figure A: Location of significant drill holes
11
JORC Table 1
The following JORC Table 1 disclosures are based on information reported by
previous explorers. Where information was not publicly disclosed by the original
operators, it remains unknown.
Section 1: Sampling Techniques and Data as reported by the previous operator.
Criteria JORC Code explanation Commentary
Sampling
techniques
(as reported
by the
previous
operator)
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• RC drilling using face-sampling hammers. 1m
samples collected via on-board cone splitter
(3-tier, 1:8 ratio) into pre-numbered calico bags
(~3kg). All metre intervals submitted for assay.
Gold analysed using 50g fire assay with AAS
finish (0.01 g/t LOR). Multi-element (Au + 48
elements) on selected EOH samples using 4-
acid digestion with ICP-OES/MS finish
(Intertek Genalysis, Kalgoorlie).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
• RC drilling using truck-mounted rig with 5.5-
inch (140mm) face-sampling hammers.
Booster pressure 350 psi; dry returns except in
unconsolidated overburden (single-stage
compressor).
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Recovery visually estimated by sample weight
(>90% typical); logged per metre. Wet samples
logged but not preferentially sampled. No
grade-recovery relationship observed. 1m
sample sizes (3kg) adequate for Au
exploration in greenstone.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Qualitative geological logging of all metre
intervals (lithology, mineralisation, alteration,
structure, weathering).
• Quantitative for density where applicable.
Chips photographed in trays. 100% of holes
logged.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half
or all core taken.
• If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
• 1m RC intervals riffle-split on-site to ~1kg sub-
samples (dry preferred; wet samples dried
before splitting). Pulverised to -75 µm at
Intertek Kalgoorlie; split to 50g for assay. Field
duplicates every 20m (spear sampling); no
bias noted. Sample sizes appropriate for
orogenic Au.
12
Criteria JORC Code explanation Commentary
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been established.
• Au by 50g fire assay/AAS (0.01 g/t LOR); multi-
element by 4-acid/ICP-MS (near-total).
Handheld XRF on pulps for pathfinders (As,
Sb). Standards (3 levels), blanks, duplicates
every 20 samples (3% QA/QC); all within ±10%
of expected. No bias; 10% external checks at
ALS Perth. Lab audits standard.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Significant intercepts (>0.5 g/t Au over 2m)
verified by Principal Geologist and Executive
Director (Exploration). No twinned holes (first-
pass). Data logged via LogChief; entered and
validated in Datashed; 100% QA/QC checks.
Location of
data points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Collars surveyed by DGPS (GDA94 Zone 50,
±2m accuracy). Down-hole surveyed every
30m using north-seeking gyro. Topo from
1:25,000 digital contours (±5m).
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Nominally 200m x 50m grid (first-pass over
2.5km strike); sufficient for anomaly definition,
not resource. No sample compositing.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
• If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Lines oriented 090° (E-W), perpendicular to N-
S structures. Vertical holes (-90°); no bias
identified.
Sample
security
• The measures taken to ensure sample security. • Pre-numbered bags sealed in polyweave;
transported by GOR to lab.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• An internal audit was conducted post-program;
no issues were identified.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• Bloodwood (E38/4002) and Brahman
(E38/4000) are both pending tenements,
100% owned by Cazaly Resources Limited.
• The Company is not aware of any
impediments to the licences being granted.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• Drilling has previously been conducted by
Gold Road Ltd.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Romano Project tenements encompass
part of the Yamarna Terrane.
13
Criteria JORC Code explanation Commentary
• The Yamarna Terrane is host to the Yamarna
and Dorothy Hills Greenstone Belts, the
eastern-most identified Greenstone Belts of
the Archean Yilgarn Craton. The western
margin of the terrane is marked by the north-
west to south-east trending Yamarna Shear
Zone.
• This shear zone also forms the western
boundary of the Yamarna Greenstone Belt,
which varies in thickness from 3 to 30 km.
Approximately 25km to the east of the
Yamarna Shear Zone is the Dorothy Hills
Greenstone Belt, which strikes in a north-
west to south-east orientation for
approximately 90 km, and varies in thickness
from 3 to 15 km.
• The sequence of the Yamarna Greenstone
Belt is in faulted contact with plutonic igneous
rocks of similar age, including quartz diorites,
granites, and quartz migmatites. The
sequence is partially covered by Permian age
glacial sediments of the Paterson Formation.
• Mineralisation along the Yamarna and
Dorothy Hills Shear zones is commonly
characterised by broad zones of
disseminated and vein-hosted gold
associated with quartz-carbonate ± sulphide
alteration. Gold is closely associated with
pyrite and minor arsenopyrite within zones of
intense sericite–carbonate alteration
developed along major shear zones and
brittle-ductile deformation corridors.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
• Refer to Table A.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Results have been length weighted.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down hole length, true width not known’).
• The down hole intercepts reported are
interpreted to be close to true width.
14
Criteria JORC Code explanation Commentary
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Refer to Figures in this report.
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• All intercepts >0.5 g/t Au have been reported.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• No other recent exploration data to report.
Further work • The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided this
information is not commercially sensitive.
• Further drilling is planned to follow up the
significant intercepts reported here.
Share your feedback
Discover