The Baden-Powell Project contains a shallow, largely unmined inferred gold resource reported at 595,300 t at 1.2 g/t Au above a 0.5 g/t cut-off, with the majority of mineralisation located within 100 m of surface and open to the north, south and at depth. The project is situated on a granted mining lease and within close proximity to the Goldfields Highway and multiple processing facilities.
Drilling has returned results including 9 m at 4.0 g/t Au from 18 m, 8 m at 2.8 g/t Au from 76 m and 3 m at 5.7 g/t Au from 12 m. Planned work includes extensional and infill drilling to expand mineralisation along strike and to test down-dip primary lodes.
